Compliance Resource Centre TFW-CRC-01 · Rev 1.0

Pre-Tender Fire Door Checklist

A clause-referenced review of the fire door schedule before the tender is frozen. Every item cites its source clause, so each one can be defended in a design review.

  • Based on IS 3614:2021 with Amd 1 (2023)
  • And NBC 2016 Part 4 · NBCS 2026 Part F
  • Reviewed Aug 2026

Before you rely on this: fire safety requirements vary by state and municipality, and most state byelaws still reference NBC 2016 rather than NBCS 2026. Ratings shown are those commonly specified under the cited clauses — always confirm the governing code edition and any local additions with the authority having jurisdiction (AHJ) before tender.

The project Printed at the head of your record

1 Rating and classification 0/7

2 Sizes and configuration 0/4

3 Leaf and core construction 0/5

4 Frames 0/3

5 Seals 0/3

6 Glazing / vision panes 0/4

7 Ironmongery and certification 0/9

8 Installation and interfaces 0/6

9 Documentation to demand in the tender (make these submittal conditions) 0/7

10 Red flags that should fail a technical evaluation 0/7

Tick "clear" only when the offer has been checked against the flag and found free of it.

Notes and sign-off Signed by hand once printed

  • Reviewed by
  • Checked by
  • Date

These three lines are left blank on purpose. They print on the record for wet signatures.

Sources

IS 3614:2021 with Amendment No. 1 (2023), BIS — clauses 4–9, Annexes A and C · SP 7:2016, NBC 2016 Part 4 — clauses 2.22, 2.39, 3.4.5, 4.2.9, 4.4.2.4.x, 4.6.1, 6.1–6.9, Annex E · SP 7:2026, NBCS 2026 Part F — clauses 2.22 Notes 1–6, 4.4.2.4.1(f), 4.6.1 · IS 17518 (Part 1):2022. Items marked "mfr guidance" are manufacturer recommendations, not code text.

This checklist is a neutral yardstick — hold any vendor to it, including us.

0 / 55 checked